Graaftr Digital Studio Ltd, trading as Mouriaux · 19 November 2026
Without new money the company is short by — by the end of January, or — if the December deposits land. The pipeline alone does not recover it. With a loan that clears iwoca, recovery needs about — a month of new work from April, roughly — projects of £20,000 by the end of 2027.
1 · Where things stand
Bank balance at the end of each week, excluding VAT. Below zero is what has to be funded. The orange line is what iwoca can still lend before the £55,000 cap.
Tom's pay funds the household, so the two are linked. Cards cost about £660 a month in interest at 22% to 29%.
| Item | Amount |
|---|
2 · What is in the pipeline
Full value is the fee if the deal is won. Weighted value is full value multiplied by our confidence, a guide to what is likely across all deals. No single deal pays the weighted figure.
| Deal | Full value | Confidence | Weighted | Starts | Where it stands |
|---|
| Recurring plan | Full a month | Confidence | Weighted a month |
|---|
| When | Opportunity | Basis | Value |
|---|
At the pilot price of £6,800 per business, of which Mouriaux keeps about £3,840 after the partner's film and the joint fund. Based on 140 members, a figure still to be confirmed.
| Members taking part | Businesses | Total fees | Mouriaux's share |
|---|
3 · What recovery needs
Recovery means the company covering its own costs again and holding £10,000 by December 2027. Two funding routes, compared. Clearing iwoca removes £3,354 a month of repayments.
| Funding route | Loan needed | Costs a month | Costs, Apr to Dec |
|---|
4 · Can the pipeline cover it?
What the known pipeline could bring in between April and December 2027. Unquoted projects use indicative values.
| Opportunity | Full value | Confidence | Likely value | When | Priced |
|---|
On its own, no. If every opportunity lands, cash still ends 2027 at — with iwoca cleared, because of the costs carried through February and March. At its likely value it ends at —.
5 · The likely path
Each line includes the loan. The green line adds the new work needed on top of the likely pipeline.
6 · What else is needed
On top of the likely pipeline, to reach £10,000 in the bank by December 2027. Projects of about £20,000, with one proposal in three won.
The something else is new projects, and the funding route sets how many. Clearing iwoca means about two fewer projects to win in 2027. The sources already in motion are referral partners, the peer group, cold outreach to engineering, events and hospitality, the trade bodies and the joint venture products.
7 · How the gap is funded
| Option | Amount | Cost | Monthly interest | Time to arrange | Note |
|---|
| Assumption | Used |
|---|
Updated 19 November 2026. Prepared by Mouriaux from Xero, HubSpot, the iwoca schedule and household statements. Figures exclude VAT. Private: please do not forward.